- Country: USA
- Summary: Hill Air Force Base, UT Storage Igloos Demolition
- UST Ref No: 125362751
- Deadline: 02 Sep 2025
- Competition: ICB
- Financier: Self Financed
- Purchaser Ownership: Public
- Tender Value: Refer Document
- Notice Type: Tender
- Document Ref. No.: W9123825QA030
- Purchaser's Detail :
Purchaser : DEPT OF DEFENSE | DEPT OF THE ARMY
KO CONTRACTING DIVISION 1325 J STREET, SACRAMENTO , CA 95814-2922, USA
Primary Point of Contact: Jennifer Ferrer, Jennifer.L.Ferrer@usace.army.mil
Secondary Point of Contact: Daniel E. Czech, daniel.e.czech@usace.army.mil
Email :jennifer.l.ferrer@usace.army.mil
- Description :
- Description
28-Aug-2026: Issuing Amendment to delete the PIEE requirements in the SAM.gov description that were not present in the solicitation.
26-Aug-2025: Issuing Amendment to formalize the soliciation extension reflected in SAM.gov.
The United States Army Corps of Engineers (USACE) Sacramento District (SPK) anticipates a potential requirement for to complete the removal of two (2) earth covered reinforced concrete modular Munitions Storage Magazines (MSMs) at Hill Air Force Base (HAFB), UT. These two existing buildings are numbered 1411 and 1432 and combined equal 4092 sf total. The construction type is reinforced concrete. There is a finish membrane waterproofing layer buried between the concrete structure and finish grade. The site shall be leveled out and graded to match the existing adjacent grades in a manner that will not cause excess stormwater runoff pooling. Areas left after demolition shall be fully restored to match existing adjacent grades and vegetation specified by the reseeding requirements for Hill AFB
Included in the demolition are access roads, 6” thick asphalt pavement approach aprons, lightning protection, utilities, site improvements, communication support, and all other necessary support. Additional demolition will include, but is not limited to, the abatement/removal of asbestos containing materials (ACM) and other regulated materials (ORM), disconnect/capping of utilities, disposal of all debris materials, and restoration of the site to a specified condition. Following demolition, the Contractor shall be responsible for restoring the work site with respect to grading and proper drain
The Government estimates the requirement can be constructed within three hundred and sixty-five (365) calendar days. If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration whe...
- Documents :
Tender Notice
Solicitation-Amendment-W9123825QA0300002-SF-30.pdf
Solicitation-Amendment-W9123825QA0300001-SF-30.pdf
If you are registered member, kindly login to view full details of this tender notice:
CLICK HERE TO LOGIN