MCC Chicago - Repair Sewer Line

USARFP notice for MCC Chicago - Repair Sewer Line. The reference ID of the tender is 123725594 and it is closing on 18 Aug 2025.

100% Secure Payments

Tender Details

  • Country: USA
  • Summary: MCC Chicago - Repair Sewer Line
  • UST Ref No: 123725594
  • Deadline: 18 Aug 2025
  • Competition: ICB
  • Financier: Self Financed
  • Purchaser Ownership: Public
  • Tender Value: Refer Document
  • Notice Type: Tender
  • Document Ref. No.: 15BFA025Q00000257
  • Purchaser's Detail :
  • Purchaser : JUSTICE, DEPARTMENT OF | FEDERAL PRISON SYSTEM / BUREAU OF PRISONS
    USAF RES CMPLX 346 MARINE FORCES DR, GRAND PRAIRIE , TX 75051, USA
    Primary Point of Contact: Luke Bonner, lbonner@bop.gov
    Email :lbonner@bop.gov

  • Description :
  • Description
    THIS IS A PRE-SOLICITATION SYNOPSIS OF PROPOSED CONTRACT ACTION. THIS IS NOT A SOLICITATION OR INVITATION FOR OFFERORS TO SUBMIT BIDS. THIS NOTICE WILL BE POSTED FOR A MINIMUM OF 15 DAYS PRIOR TO POSTING OF THE SOLICITATION.

    The Federal Bureau of Prisons (FBOP) anticipates issuance of solicitation 15BFA025Q00000257 for the award of a firm-fixed-price construction contract for a project titled Repair Sewer Line at the Metropolitan Correctional Center (MCC) located in Chicago, IL.
    MCC Chicago is a federal correctional facility located at 71 W. Van Buren Street, Chicago, IL 60605. The work to be performed in association with this project includes the following scope:
    The Metropolitan Correctional Center (MCC) Chicago has a construction requirement for repairing a sewer line. The work includes replacing approximately 75 linear feet of existing 8" clay sewer line with 8" x 8" heavy cast iron pipe. The repair site is located in a secured, GSA-operated courtyard and requires precise utility locating, excavation to a depth of 6 feet, trench shoring, and protective barricades. All pavers and landscaping materials will be removed and restored to original condition upon completion. Work must be performed with minimal downtime; MCC will coordinate institutional water shutdown and restoration. The sewer system must be tested and backfilled upon successful completion. All work must comply with local, state, and federal regulations.
    See the Statement of Work/Specifications attachment included with the solicitation posting (to be issued at a later date as described herein) for the complete requirements of the work.
    Contractor is required to attend a pre-work meeting in order to coordinate and plan with the on-site staff prior to the day of work.
    The performance period for the project will be 38 calendar days from the issuance of the notice to proceed.
    Pursuant to Federal Acquisition Regulation (FAR) 36.204, the estimated magnitude o...
  • Documents :
  •  Tender Notice

If you are registered member, kindly login to view full details of this tender notice:

CLICK HERE TO LOGIN
USARFP Features

USARFP Features

Fresh and verified Tenders from USA. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • Accurate Tender Information
  • New Tenders Every Day
  • Consultants for RFI/RFP/RFQ
  • Search, sort, and filter Tenders
  • Customer Support
  • Publish your Tenders
  • Consulting Services
  • Export data to Excel or CRM

Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting ZimbabweTenders !!
Email Id is already exist !!
Invalid Captcha !

Get FREE SAMPLE TENDERS from USA in your email inbox.