- Country: USA
- Summary: Removal & reinstall a centrifugal pump
- UST Ref No: 124470430
- Deadline: 19 Aug 2025
- Competition: ICB
- Financier: Self Financed
- Purchaser Ownership: Public
- Tender Value: Refer Document
- Notice Type: Tender
- Document Ref. No.: 140G0125Q0186
- Purchaser's Detail :
Purchaser : INTERIOR, DEPARTMENT OF THE | US GEOLOGICAL SURVEY
12201 SUNRISE VALLEY DRIVE, RESTON , VA 20192, USA
Primary Point of Contact: Parkin, Dayna, dparkin@usgs.gov, Phone Number 703-648-7374
Email :dparkin@usgs.gov
- Description :
- Description
The USGS Columbia Environmental Research Center has a requirement for the removal and replacing the existing centrifugal pump and install an appropriately sized VFD (Variable Frequency Drive) and support controls. The removal of the existing centrifugal pump and installing the appropriately sized VFD includes, but not limited to the following:- All circuits shall be installed to the existing Local and National Electrical Code Standard.- Remove the current pump and replace with two (2) redundant inverter- duty centrifugal pumps that meet current needs and support future growth.- Remove the current motor starter and replace with a properly sized VFD and accurately sized circuit protection.- New pump(s) shall be capable of a minimum of 120 feet of head up to maximum of 200 feet of head.- New pump(s) shall be capable of flowing 200 gallons per minute of water.- The VFD shall have a bypass function.- The VFD shall have BACnet capabilities.- Install a digital flow meter with BACnet capabilities.- Install digital pressure gauges with BACnet capabilities on the suction and discharge piping.- Remove and replace the current piping to allow redundancy.- New piping shall have a bypass installed.- Pumps shall sit level and be easily accessed for maintenance/replacement.- Work will take place in the following county in Missouri: Boone.- Period of Performance is 30 days after notice to proceed is issued.- The magnitude of construction is between $100,000 and $250,000.- Request for Quotes (RFQ) 140G0125Q0186 will close August 14, 2025, at 10:00 am pacific standard time.- A site visit will be held on August 7, 2025, at 10:00 a.m. (EST) CONTRACTORS ARE STRONGLY ENCOURAGED TO ATTEND THE SITE VISIT. For site visit information please refer to FAR Clauses 52.236-27 and 52.236-27A*1. If you are planning to attend, please email either Dayna Parkin or Michael Prince at dparkin@usgs.gov or mprince@usgs.gov to provide you're the names who are going, and emails along with phone...
- Documents :
Tender Notice
Sol_140G0125Q0186_Amd_0003.pdf
B09_Attachment_10_Questions_and_Answers_Amendment.docx
Sol_140G0125Q0186_Amd_0002.pdf
Sol_140G0125Q0186_Amd_0001.pdf
B09_Attachment_9_Updated_Statement_of_Work_Amendme.docx
Sol_140G0125Q0186.pdf
B08_Attachment_7_Statement_of_Work.docx
B08_Attachment_2_Payment_Bond_SF25A-16d.pdf
B08_Attachment_3_Form_DI-137_Release_of_Claims.pdf
B08_Attachment_4_Statement_and_Acknowledgement_of.pdf
B08_Attachment_5_Payroll_WH-347.pdf
B08_Attachment_6_Past_Performance_Questionnaire.pdf
B03_Attachment_1_WD_MO20240084.pdf