- Country: USA
- Summary: Rubb Shelter Inspections
- UST Ref No: 123992160
- Deadline: 19 Aug 2025
- Competition: ICB
- Financier: Self Financed
- Purchaser Ownership: Public
- Tender Value: Refer Document
- Notice Type: Tender
- Document Ref. No.: W50S77-25-Q-0002
- Purchaser's Detail :
Purchaser : DEPT OF DEFENSE | DEPT OF THE ARMY
KO FOR TXANG DO NOT DELETE 14667 SNEIDER ST BLDG 12, HOUSTON , TX 77034-5586, USA
Primary Point of Contact: SMSgt Shawn T. Stewart, shawn.stewart.4@us.af.mil
Secondary Point of Contact: MSgt Buddy Ciemiengo, buddy.ciemiengo.1@us.af.mil
Email :shawn.stewart.4@us.af.mil
- Description :
- Description
The 147th ATKW, Texas Air National Guard, intends to sole source inspection services of currently owned Aircraft Shelters. The repairs will consist of: The contractor shall provide all management, tools, supplies,equipment, and labor necessary to operate and maintain the required inspections. Structures aredesigned to require a minimal amount of maintenance over the life of the structures. The inspectionshould be performed bi-annually or after the structures are exposed to winds or snow loads closeto the designed limit of the structure.
2.1. INSPECTION REQUIREMENTS
2.1.1. Check fabric tension around perimeter by pushing out fabric by hand from the inside of the structure at shoulder height. PVC should snap back sharply when released if correctly tensioned. Tighten as required. Removal of bird netting may be required.
2.1.2. Check tension rods along foundation for equal tension and lock nuts set. Tighten as required as required to equal tension in all rods in each bay area. Tighten any loose lock nuts as needed. Removal of bird netting may be required.
2.1.3. Check shackles connecting tension rods to foundation for loose pins or missing safety wire. Tighten pins as required and replace missing safety wire. Removal of bird netting may be required.
2.1.4. Check that the PVC covering is tensioned around the entire perimeter, Doors and vents. Reattach any loose PVC. Removal of bird netting may be required.
2.1.5. Check for any holes or rips in the PVC cover. Damage should be repaired according to the PVC repair procedure. Removal of bird netting may be required.
2.1.6 Check for areas of damaged galvanization or corrosion. Remove any corrosion and cover with a zinc rich coating. Removal of bird netting may be required.
2.1.7. Spot check a sample of various bolts for tightness. Tighten as required. A325 bolts are tightened according to the turn-of -the-nut method given in the A.I.S.C steel manual, 16th edition.This states tha...
- Documents :
Tender Notice
Sole-Source-Justification.pdf
If you are registered member, kindly login to view full details of this tender notice:
CLICK HERE TO LOGIN